Advanced Search Part-No.
Login / Registration Your location/language Australia, English

News

Discover the latest products and innovations from OKW and read the latest company news here.

Filter
February 2025

Partially backlit enclosure surfaces for sophisticated design options

OKW's service portfolio now includes an intriguing design option for enclosures in light base colours, such as grey-white or traffic white, suitable for applications requiring visual emphasis or reduced display.

By incorporating a specific grid pattern or individualized backlit elements (e.g., on/off status), the wall thickness of the plastic components can be internally reduced to such an extent that the light from LEDs positioned behind them shines through.

This technique enables the display of figures and letters, such as temperature readings or individual status indicators, in a visually appealing and high-quality manner. Key advantages include: the respective surfaces are not completely opened, preserving the IP protection class; no external alterations to the enclosure are visible when switched off and special light guides are not required.

Machining >>

February 2025

Practical Press Stud Fastening for Mobile Applications

For applications requiring secure fastening, such as walking, but also needing quick removal, press stud fastening is highly advantageous.

Upon request, we can machine enclosures to accommodate press studs (male or female), allowing them to be inserted or pressed in. This is particularly recommended for OKW small enclosures, such as BODY-CASE, MINITEC, CONNECT, SOFT-CASE (photo), and MINI-DATA-BOX.

Possible uses include biofeedback, measurement and recording of training/performance data or vital functions, wearables, and much more.

Feel free to ask us!

Machining >>

February 2025

OKW is environment-friendly

From 3rd February 2025, the PV system on our new logistics centre will finally be in operation.
With an output of 334 kWp, it will generate over 300,000 kilowatt-hours per year in a best-case scenario, covering a large portion of OKW's energy needs. Together with the office building's existing PV system, we will thus reduce our energy costs in the long run and minimise our dependence on conventional energy sources.